• 097 858 4477 - 094 558 4477
  • duongxuanqua@gmail.com
  • Tiếng Anh

Figure 2 shows a great flowchart of one’s checked out matched operation means

Ngày đăng : 23/06/2022


Figure 2 shows a great flowchart of one's checked out matched operation means

A conclusion and you will good schematic of one's East Nile Lake program design are given about “Methods” section together with Second advice. The explanation trailing the matched process means i glance at contained in this study aims for most measure of hydro-solidarity, “residents shopping for both,” in which governmental limitations are informal but with particular national requires remaining. Brand new paired operation method is perhaps not made to feel a recommended solution having Nile drinking water activities; instead, i make use of it showing the fresh direction regarding change in economic performance and you may strength you to definitely transboundary cooperation retains. We designed new matched up process method by hand courtesy trial-and-error, passionate by performing procedures out of early in the day degree twenty four,37,47 . From the coordinated procedure approach, all the three places provides a role playing. Ethiopia provides so much more self-reliance inside the GERD government if there is enough water from the Had tank (HADR) assuming the latest flows of the almost every other several Eastern Nile tributaries (i.age., brand new Light Nile and you will Tekeze-Atabra; Fig. 1) are large. Likewise, Egypt offers guidance having Ethiopia towards Had storage and target water launch. Paired procedure permits Ethiopia to get rid of new restrictions into the minimal launches regarding GERD that will be the main Arizona draft proposal. As an alternative, liquids launches regarding GERD always guarantee the pleasure off water usage aim to the Bluish Nile and you can Chief Nile when you look at the Sudan, assuming personally you'll together with shops was lower (lower than 50 bcm), the fresh new satisfaction of liquids practices purpose in Egypt, having Ethiopia in a position to seek even more positives under beneficial streamflow criteria. A HADR sites regarding 50 bcm matches a tank water-level of 156 meters good.s.l., that's 9 meters above the wind mill shutdown amount of this new dam twenty four . With thecoordinated process, the new surgery of your own Roseires, Sennar, and you can Merowe dams located in Sudan between your GERD and you can Egypt was adjusted to pass through h2o launches from the GERD designed to arrive Egypt. Ethiopia is believed to run the fresh GERD to maximize brand new ninety% energy accuracy and keep the very least environmental disperse of 43 Mm 3 /date, subject to limitations one liquids use objectives within the Sudan and you may Egypt try came across significantly less than particular standards.

These filling up and much time-identity operation methods was examined using 102 different 30-seasons river move sequences (traces) created using the list-sequential strategy forty-eight

Got High Aswan Dam, GERD Grand Ethiopian Renaissance Dam. Reveal schematic of the river program model is provided from inside the Supplementary Shape shaadi daten 7.

This method creates lake disperse outlines on the historical move list, taking each year about checklist as a possible first step. We utilized the 1901–2002 Nile move research to generate new lake flow outlines (discover Supplementary Fig. 1).

Sudan obtains irrigation, ton manage, and you will hydropower advantages of the latest GERD, assuming day-after-day control and you may energetic data revealing involving the GERD and you will Roseires Dam. The newest acting overall performance reveal that this type of masters was essentially the exact same towards Washington draft offer while the coordinated procedure. This is due to Sudan's geographical advantageous asset of being located upstream regarding Egypt plus the apparently brief sites dams and you will hydropower strength in the nation. Additionally, i assume that the fresh new unfavorable ecological impacts together with death of recession farming for the Sudan are similar from the several checked-out GERD operation problems. Hence, we just expose the outcomes of your affects of the matched up operation to have Ethiopia and Egypt.

Control is also raise drinking water usage

Profile 3 portrays the alteration within the Nile liquid withdrawal in the Egypt, hydropower age bracket of your GERD and Egypt, plus the complete tank evaporation, Toshka spills, and you may river station seepage down to matched procedure compared into the Washington draft proposition. Desk dos profile statistics for the majority of of your own metrics found from inside the Fig. step three. Performance reveal that when you look at the 77% of your lines artificial, new matched process perform drop off Egypt's total liquid deficits as compared to the brand new Washington draft offer. All of the high just like the HADR is full 44 and can meet one close-label Egyptian water-supply deficits that can occur in a certain simulator. Supplementary Fig. dos means that this new reduces inside the Egypt's irrigation deficits occur while in the multiyear attacks from water lack. Additional Fig. dos including reveals a great drawdown regarding GERD storage into coordinated procedure to assist alleviate irrigation drinking water deficits when you look at the Egypt whenever Got storage drops lower than 50 bcm. This lowering of GERD shop resulted in a little reduction in the dam's total opportunity age bracket.

Dương Xuân Quả (Năm Nhã)

Hệ thống cánh quạt siêu tiết kiệm điện năng và lò đốt tiết kiệm nhiên liệu đốt;

Nguyên liệu đốt đa dạng như: trấu, củi trấu, củi cây, than đá, vỏ cà phê, cùi bắp;

Sấy gạo đạt tiêu chuẩn xuất khẩu, gạo không ẩm vàng, tỷ lệ tấm đạt 3-5%, tỷ lệ hạt giống nẩy mầm từ 95 -97%;​

Sấy được nhiều loại nông sản như: lúa, bắp, cà phê, cacao, ớt trái, vỏ đầu tôm, sắn, khoai mì, thảo dược...

Hỗ trợ trực tuyến

Bản đồ

  Chúng tôi có thể giúp gì cho bạn?

Hỗ trợ trực tuyến